Final inspection of completed plumbing and drainage works

A final inspection is completed to ensure that the work meets the relevant standards and that there are no matters that could impact upon the City's sewer and water infrastructure. 

To check the fees see the City's adopted fees and charges

Inspections must be booked for the following works prior to covering or backfilling:

  • All external drainage including the point of connection to the City's sewer
  • All drainage (internal and external) including trade waste
  • Work that did not comply with an earlier inspection
  • Sealing of disused services (water and sewer)
  • Final inspection at the completion of work and prior to premises being occupied

The inspecting officer will make contact and advise in the event that an inspection booking request will not be undertaken.

The Applicant or responsible plumber must contact us no later than 4.30pm the day prior to book a final drainage inspection.

Please complete the following online form the day before your desired inspection date.

Inspections can be booked Monday to Friday.  You can select either an AM booking (10.30am to 12.30pm) or a PM booking (1.30pm to 3.30pm)

Inspection Booking Request

The plumber does not need to be in attendance but needs to provide access to the site for the final inspection to take place but will need to submit the sewer diagram or final compliance certificate.

Final Inspection considerations

The final inspection will focus on the external components of the sewer and drainage works to ensure that they will not adversely impact the City's sewer and water infrastructure.
Final inspection checks will include a review of the following:

  • Height of the overflow relief gully (ORG) to ensure that it is a minimum of 150mm below the internal finished floor level and a minimum 75 mm above external finished ground level.

  • That at least one inspection opening has been brought to the surface and fitted off with a bolted trap screw on the main drain in addition to the Inspection Opening located at the sewer junction.

  • That all upstream Vent Pipes have been correctly terminated through the roof to atmosphere as required

  • That any manhole within the property remains visible and has not be affected by the placement of landscaping, garden edges, retaining walls and the like

  • That water meter’s are correctly installed; are located in a readily accessible position to enable future meter reading and any attached taps are securely supported

  • That the sewer diagram has been correctly completed in accordance with the NSW Fair Trading requirements

Inspection Reports

Any matters observed during the inspection will be referenced in a report emailed to the applicant. The report will detail any required rectification works and the timeframe in which the works are to be completed. A formal letter will be issued in respect to any matters involving significant rectification works.

Reinspection fees

The Applicant and or plumber must contact and book a re-inspection upon completion of any identified non-compliant matters. A reinspection fee may be levied for the inspection as determined in accordance with the City's adopted Fees and Charges.

Completion of Works

The application record will be finalised upon satisfactory completion of plumbing and drainage works.

The City reviews documentation upon issue of the Occupation Certificate to ensure that Plumbing and Drainage works have been finalised. Correspondence will be issued to the Applicant advising of any outstanding matters.