Skip Ribbon Commands
Skip to main content
Navigate Up
Sign In

Road Works and Construction Works

Council Activities 2 March 2015

 All works are subject to change due to weather conditions

 

Activity
Location
Details
Bitumen Patching
Main Road 151 – Nana Glen.
Emerald Beach& Northern Beaches – various locations.
Motorists are to take care.
Drive to loose gravel conditions.
Signs will be in place.
Gravel Patching
Coffs Harbour –Argyll Street.
Motorists, cyclists & pedestrians are to take care.
Drive to loose gravel conditions.
Traffic control & signs will be in place.
Bitumen Reseal
Toormina to Boambee East – Linden Avenue.
Toormina – Bower Crescent.
Bonville – Pine Creek Way.
Motorists, cyclists & pedestrians are to take care.
Drive to loose gravel conditions.
Signs will be in place.
Asphalt Resurfacing
Toormina – Hogbin Drive (Toormina Round a bout to Hi Tech Drive).
Motorists, cyclists & pedestrians are to take care.
Works will be conducted on Wednesday 25th & Thursday 26th February during the hours of 6pm to 6am.
Drive to loose gravel conditions.
Traffic control & signs will be in place.
Slashing
Karangi – Karangi Dam.
Sandy Beach – reserves & roadsides.
Main Road 151 – Nana Creek Road.
Bonville – Pine Creek Way.
Motorists & cyclists are to take care.
Signs will be in place.
Bank Slashing
Coramba to Nana Glen – East Bank Road.
Motorists & pedestrians are to take care.
Signs will be in place.
Mowing
South Coffs, Sawtell & Coffs Harbour
Motorists & pedestrians are to take care.
Signs will be in place.
Weed Spraying
Reserves: Coffs Harbour, Boambee, Sawtell, Boambee East, Coffs Harbour CBD;  Roadside - Moonee
Pedestrians are to take care.
Signs will be in place.
Wick-Piping
All areas – Korora & Coffs Harbour
Motorists & pedestrians are to take care.
Signs will be in place.
Maintenance Grading
Lowanna – Moleton Road.
Bonville – Gleniffer Road.
Motorists are to take care & be aware of heavy machinery.
Drive to loose gravel conditions.
Signs will be in place.
Drainage Maintenance
Bonville – Gleniffer Road
Cradle Creek, Lowanna
Motorists are to take care & be aware of staff on road verge.
Signs will be in place.
Kerb & Guttering Repairs
Coffs Harbour – West Argyll Street.
Woolgoolga – Bultitude Street & Scarborough Street.
Corindi Beach - Simon Street.
Motorists & pedestrians are to take care.
Signs will be in place.
Footpath Repairs
Coffs Harbour - Columbus Circuit.
Toormina – Nariah Crescent.
Motorists & pedestrians are to take care.
Signs will be in place.
Boat Ramp Dredging
Coffs Harbour – Jordon Esplanade “Jetty Boat Ramp”.
Boat operators are to take care & be aware of heavy machinery.
Signs will be in place.
Bridge Limits Reinforced
Upper Orara – Island Loop Road “Kellets Bridge” (Friday Creek Road to Dingo Creek Road).
Kellets Bridge 9 tonne (max GVM).
Signs will be in place.
Water Main Reconstruction
Karangi – Upper Orara Road (Karangi Dam to Water Treatment Plant).
Motorists & cyclists are to take care.
Be aware of heavy machinery.
Drive to loose gravel conditions.
Traffic control & signs will be in place.
Bridge Construction
Coffs Harbour – Shephards Lane.
Bucca - Herds Road
Motorists & pedestrians are to take care.
Traffic control, signs & traffic detours will be in place.
Boat Ramp &
Road Rehabilitation
 
Coffs Harbour – Jordon Esplanade “Jetty Boat Ramp”.
 
Motorists, cyclists & pedestrians are to take care.
Drive to loose gravel conditions.
Traffic control will be in place when required.
Signs will be in place.
Footpath & Cycleway Construction
Sandy Beach – Solitary Island Way (Graham Drive).
 
Motorists are to take care.
Be aware of heavy machinery & drive to road conditions.
Speed reduction to 60kms / hour implemented through & past work site.
Traffic control & signs will be in place.
Water Main Relocations
Arrawarra – Eggins Drive.
Motorists, cyclists & pedestrians are to take care.
Be aware of heavy machinery & drive to road conditions.
Speed reduction to 60kms / hour implemented through & past work site.
Traffic control & signs will be in place.