Sewer Service Diagram

A community unlike any other

Explore inspiring articles, discover events, connect with locals and learn more about Coffs Harbour City Council.

DA

Online DAs only from January 1

The NSW Government has mandated that all Development Applications lodged with us must be through the NSW Online Planning Portal from 1 January 2021 ...

Read more
Swim Between The Flags

Swim Between The Flags

Stay safe at the beach this summer by swimming between the red and yellow flags at patrolled beaches...

Read more
Disaster Dashboard

Local Emergencies Disaster Dashboard

Council has a Disaster Dashboard to help you prepare for, cope and recover from any local emergency...

Read more
View all news

Latest News

Sam Dyball musician

Live music in City Square extended through March

The Live and Local music series will continue throughout March with musicians scheduled every Wednesday at 10.30am in City Square...

Read more
Cultural and Civic Space interior design

Construction to Begin on Cultural and Civic Space

Building work on the Cultural and Civic Space is scheduled to start in April following approval of the tender for the construction phase of the project...

Read more
New Cultural and Civic Space

Take a Fly Through Coffs Harbour’s New Cultural and Civic Space

This fly-through video explores the design of Coffs Harbour’s new Cultural and Civic Space project, focusing on the different levels inside of the building...

Read more
Visit Coffs Newsroom

Sewer Service Diagram

​All Sewer Service Diagrams (SSDs) need to be submitted meeting the following specifications:   

  • All drawn and required text information on the diagram must be complete and legible in a fine point black pen.
  • SSD must be drawn to a scale. Preferred scales are: 1:100; 1:200; 1:250;1:500.
  • North point must be shown on the diagram.
  • Include only symbols and abbreviations as shown on the template legend.
  • All lettering and figures are to be drawn clear and legible.
  • Diagrams are only to show sanitary drainage up to the point of connection within the property boundary, property boundaries and building outlines.
  • Clearly show the sanitary drainage layout up to the point of connection within the property boundary indicating all internal points, external drainage, trade waste and any onsite treatment / diversion system up to the point of connection with the Network Utility Operators sewer including any existing sanitary drainage remaining in use on the property.
  • Street name and number (for street frontage) and/or Lot number and DP (deposited plan) number along with suburb and municipality.
  • If there is no connection to a Network Utility Operator’s sewer please label as private sewer, community title, onsite septic tank or AWTS etc.

A4 and A3 SSD Templates are available via the Fair Trading website

    Licensee details must be provided on SSD including:

  • licence number
  • certificate of compliance number
  • signature and date.