Photos of Construction of Water Filtration Plant
Work began in October 2007 on the construction of the new Coffs Harbour Water Filtration Plant at Karangi.
The $59 million Water Filtration Plant project is one of three major projects being implemented through the Coffs Infrastructure Alliance. The project is expected to be completed in early 2009.
|
![]() |
|
The sludge thickener tank undergoes testing as the sludge thickener building nears completion (photo January 23, 2009). |
Testing begins at the washwater tank (photo January 23, 2009). |
|
![]() |
![]() |
|
Internal fitout continues in the Dissolved Air Filtration and Flotation (DAFF) building, with equipment hoisted in by cranes (photo January 23, 2009). |
Aerial view of the site showing the DAFF building, sludge thickener tank and building, control room, washwater tank, treated water storage tank and treated water pump station (photo January 30, 2009). |
|
![]() |
![]() |
|
The sludge thickener tank and sludge thickener building are almost complete (photo November 21, 2008). |
Part of the UV filtration system in the Dissolved Air Filtration and Flotation (DAFF) building (photo November 21, 2008). |
|
![]() |
![]() |
|
Flow control pipework installation is now underway (photo November 21, 2008). Full commissioning of the water filtration plant is expected in March 2009. |
Three of the six main pumps are installed in the treated water pump station building (photo November 21, 2008). |
|
![]() |
![]() |
|
A bird's eye view of the Dissolved Air Filtration and Flotation (DAFF) building (foreground) (photo October 24, 2008). |
Construction of the control building and education centre is almost complete (photo October 24, 2008). |
|
![]() |
![]() |
|
Treated water storage tank, treated water pump station and washwater tank taking shape (photo October 24, 2008). |
Aerial perspective of the sludge thickener tank and the sludge thickener building (photo October 24, 2008). |
|
![]() |
![]() |
|
The walls begin to take shape, and construction of the roof begins at the Dissolved Air Filtration and Flotation (DAFF) building (photo August 21, 2008). |
Progressing quickly: the washwater tank (right), treated water pump station (centre), and the treated water storage tank (photo August 21, 2008). | |
![]() |
![]() |
|
| The sludge thickener tank (left) and the rapidly progressing sludge thickener building, in the background (photo August 22, 2008). | A bird's eye view of the construction of the DAFF building (centre), with the control room building located in the background (photo August 18, 2008). | |
![]() |
![]() |
|
Construction of the filtration plant's control building progresses swiftly. The building will not only accommodate operators, but will also provide areas for educational visits (photo June 26, 2008). |
Foundations for the sludge thickener building begin to take shape (foreground), while civil work on the treated water storage tank is nearing completion (photo June 26, 2008). |
|
![]() |
![]() |
|
Pipeworks progress, leading to the washwater tank (right of frame) and treated water pump station (centre). The treated water storage tank is located in the background (photo June 26, 2008). |
Work continues on the Dissolved Air Filtration and Flotation (DAFF) building (right), while civil construction of the sludge thickener tank nears completion (photo June 26, 2008). |
|
![]() |
![]() |
|
A section of the construction site for the Dissolved Air Filtration and Flotation (DAFF) building (photo April 18, 2008). |
Formwork for the construction of the sludge thickener tank (photo April 18, 2008). |
|
![]() |
![]() |
|
Construction of the washwater tank (photo April 18, 2008). |
Site entry for construction of the DAFF control building (photo April 18, 2008). |
|
![]() |
![]() |
|
Earthworks near completion for the Washwater Tank, Sludge Thickening Tank and Treated Water Storage Tank (photo Feb 28, 2008). |
Construction works advance on the framework for the walls of the DAFF, while earthworks continue (photo Feb 28, 2008). |
|
![]() |
![]() |
|
Framework takes shape for the DAFF building at the WFP - this photo was taken from the tower crane that was relocated from new Water Reclamation Plant site (photo Feb 28, 2008). |
Framework and formwork for a small section of the DAFF building, as seen from ground level (photo Feb 28, 2008). |
|
![]() |
![]() |
|
Earthworks continue to prepare the site for the Water Filtration Plant's washwater tank, treated water tank and treated water pump station (photo Jan 24, 2008). |
Site preparations for the foundations of the Water Filtration Plant's control building (photo Jan 24, 2008). |
|
![]() |
![]() |
|
Construction begins on the foundations for the Water Filtration Plant's Dissolved Air Filtration and Flotation (DAFF) building site (photo Jan 24, 2008). |
Works begin to construct the WFP's filtered water channel, and UV treated water channel (photo Jan 24, 2008). |
|
![]() |
![]() |
|
Coffs Infrastructure Alliance team members with Chairman of Council's City Services Committee, Councillor Bill Palmer, after inspecting the Water Filtration Plant's Dissolved Air Filtration and Flotation (DAFF) building site. Concrete has now been poured to provide a blinding layer that will assist in constructing foundations (photo Nov 28, 2007). |
The view east towards the site of the new Water Filtration Plant's main building. Earthworks continue, and temporary buildings have been erected to service the needs of about 80 workers who will be on the site during peak construction periods (photo Nov 28, 2007). |
|
![]() |
![]() |
|
Local media were at a site inspection of earthworks in preparation for construction of the new Water Filtration Plant. A total of 22,000 cubic metres of earth was removed from various construction sites, 8,000 cubic metres of high quality fill was restored, and 5,000 cubic metres of fill is being recycled to build the Bakers Road storage facility, a flood mitigation project (photo Nov 28, 2007). |
Construction works to build a 2 megalitre sediment pond as part of the Water Filtration Plant project. An additional pond is being created to act as an emergency storage facility (photo Nov 28, 2007). |
|
|
|
|
Excavations for the foundations of the Water Filtration Plant's Dissolved Air Filtration and Flotation (DAFF) building. Unsuitable foundations were removed and replaced with select subgrade fill (Oct 2007). |
Excavations for the WFP's tank facilities, which will include a Washwater Tank, Sludge Thickening Tank and Treated Water Storage tanks (Oct 2007). |
|
|
![]() |
|
Excavations for the WFP Storage Tanks (Oct 2007). |
Temporary buildings will service 80 workers during peak construction activity (Oct 2007). |
|
|
|
|
Excavations for a 2 megalitre emergency storage lagoon (Oct 2007). |
Council aims to preserve this farm building as it has heritage interest. |