Construction of the new Coffs Harbour Water Reclamation Plant began in November 2006. The new $96 million plant is located adjacent to the existing sewerage plant between Howard Street and Christmas Bells Road.

Below are photos showing the progress of works in the construction of the new Coffs Harbour Water Reclamation Plant:
pumps for reclaimed water distribution   aerial view of the wrp site
Pumps have been installed to distribute reclaimed water for a wide range of users including nurseries, sports grounds, schools, and the race course (photo February 3, 2009).   Part of the new Water Reclamation Plant, including the oxidation ditches, switchrooms, clarifiers, UV filtering, sludge building, secondary aerobic chambers and anaerobic reactors (photo January 30, 2009).
clarifiers 1 + 2 undergo testing   testing of oxidation dicth no1
Reclaimed water is used for testing of clarifiers one and two (photo February 3, 2009).   Oxidation ditch number one is also tested using relaimed water (photo February 3, 2009).
wrp sludge building   sludge thickener and centrifuge

The sludge building (left) is now almost complete (photo Nov 21, 2008).

 

The sludge thickener and centrifuge are now installed (photo Nov 21, 2008).

testing of clarifier 1   secondary aerobic chamber 2

Clarifier one is filled with water to undergo hydrostatic testing (photo Nov 21, 2008).

 

Secondary aerobic chamber two is now being tested (photo Nov 21, 2008).

Handrail construction on Clarifier One   Pump station for Deep Sea Release

Handrail construction begins on clarifier number one (photo June 26, 2008).

 

The pump station for discharge of excess reclaimed water through the Deep Sea Release (photo June 26, 2008).

Sludge building walls begin   Motor Control Centres

Tilt-up wall panel construction begins for the new sludge building (photo June 26, 2008).

 

Assembly of motor control centres in switch room one (photo June 26, 2008).

Aerobic reactors and pump station   Clarifier no 1 april 08

Anaerobic reactors (foreground), with construction continuing on the pump station in the background (photo April 18, 2008).

 

Clarifier number one (left), with oxidation ditch number one in the centre, and the pump station building pictured to the right (photo April 18, 2008).

Oxidation ditch no 2   filter block at the Coffs WRP

Oxidation ditch number two under construction (photo April 18, 2008).

 

The filter block begins to take shape (photo April 18, 2008).

Control building april 08   Switch building 1

The exterior of the main control building nears completion (photo April 18, 2008).

 

Plant technician Ross Waugh inspects switch room number one (photo April 18, 2008).

WRP inlet works April 08   Inlet pipes for new Coffs WRP

A section of the Inlet Works (photo April 18, 2008).

 

Inlet pipes completed and awaiting connection (photo April 18, 2008).

Construction  on Clarifier No 1   Clarifier number two under construction

Clarifier number one begins to take shape (photo Jan 25 2008).

 

Clarifier number two construction is well advanced (photo Jan 25 2008).

Control building under construction   Anaerobic reactors under construction

The new Water Reclamation Plant's control building and switchroom under construction (photo Jan 25 2008).

 

Anaerobic reactors under construction (photo Jan 25 2008).

WRP Oxidation tank is tested   WRP Clarifier construction

Councillors and staff on a site inspection of the oxidation tank, at the testing stage (photo 7 Nov 2007).

 

Construction of the clarifier at the new Water Reclamation Plant (photo Coffs Infrastructure Alliance, Oct 2007).

WRP works Sept 07   WRP works Sept 07

Concrete walls were constructed in August/September 2007.

 

    

This concrete pour was completed early September 2007.

Construction works at new Coffs WRP July 07  

Construction works at new Coffs WRP July 07

Work is progressing well at the site of the Coffs Harbour Water Reclamation Plant (July 2007).

 

 

440m³ of concrete was poured as part of the construction of one of the WRP's oxidation tanks(July 2007).

Construction works at new Coffs WRP July 07  

WRP initial earthworks Feb 07

Alliance staff working on the concrete pour
(July 2007).

 

Earthworks at the site of the new Coffs Harbour Water Reclamation Plant (February 2007).

 

Visual Element

Visual Element Back To Top

Angle image Angle image Spacer Element Angle image Angle image Spacer Element Angle image Angle image Spacer Element Angle image Angle image Spacer Element Spacer Element
Publications & Reports Publications & Reports Learning Centre Learning Centre Community Directory Community Directory
Forms & Applications Forms & Applications Media Centre Media Centre Creative Directory Creative Directory Community Forums Community Forums