Maintenance Works
 

​Council Activities 25 July 2016

​​​All works are subject to change due to weather conditions.
 

Mark Johnson   Infrastructure Construction and Maintenance – Depot Administrator  02 6648 4504

Activity
Location
Details
Sediment Removal
Boambee East – Spoonbill Lake, Linden Avenue.
Pedestrians are to take care.
Signs will be in place.
Fibre Optic Cable Hauling
 
Motorists, pedestrians & cyclists are to take care.
Signs will be in place.
Bitumen Patching
 
Heavy Patch
Lowanna – MR-120
All areas – Coffs Harbour/ Sawtell
Safety Beach – Safety Beach Drive
Coffs Harbour – Marina Drive
Motorists & cyclists are to take care.
Drive to loose gravel conditions.
Signs will be in place.
Footpath Repair
 
Footpath Construction
Toormina – Toormina Road
 
 Arrawarra – Solitary Islands Way
“Arrawarra Creek”
Motorists, cyclists & pedestrians are to take care.
Drive to loose gravel conditions.
Signs will be in place.
 
Slashing/Mowing
All areas –  Sandy Beach & Coffs Harbour including the Jetty & City Hill
Motorists, pedestrians & cyclists are to take care.
Signs will be in place.
Bank Slashing
All areas – Toormina/Sawtell
Motorists & cyclists are to take care.
Traffic control & signs will be in place.
Weed Spraying
Roadside – Nana Glen – Nana Creek Road
Reserves –  Woolgoolga/Corindi Beach
  Other Land – Dairyville/Nana Glen
Motorists & pedestrians are to take care.
Signs & Traffic control will be in place.
Vegetation Works
MR 120 between Lowanna & Ulong
Traffic controllers & signage will be in place. Motorist to adhere to speed restrictions
Car Park Repairs
 
Motorists, pedestrians & cyclists are to take care.
Be aware of heavy machinery & watch out for workmen
Drainage Maintenance
 
All areas Upper Corindi
Sandy Beach – Holloways Road & Morgans Road
 
Motorists & pedestrians are to take care.
Signs will be in place.
Drainage Construction
 
Motorists & pedestrians are to take care.
Signs will be in place.
Bridge Re-Construction
Nana Glen – Ferretts Road “Ferretts Bridge”.
 
 
Lowanna - Wades Camp Creek
 
Ulong – Lower Bobo Road “Rhoades Bridge” with side track
Motorists are to take care.
Road works at bridge.
 
A 10 tonne load limit has been imposed on Wades Camp Creek Bridge.
Vehicles over the 10 tonne load limit are to use the side track.
Traffic control & signs will be in place.
Beach Access Construction
Woolgoolga – Back Beach & Market Street
Pedestrians are to take care.
Access will be CLOSED 
Temporary fencing & signs will be in place.
Maintenance Grading
 
Motorists & cyclists are to take care.
Be aware of heavy machinery & drive to road conditions.
Signs will be in place.
Landslip Repairs
 
Bonville - Pine Creek Way.
Motorists are to take care.
One lane CLOSED at Pine Creek Way with traffic control in place.
Works are being conducted by Roads & Maritime Services (RMS).
Signs will be in place.
Road Rehabilitation
 
Motorists, cyclists & pedestrians are to take care.
Be aware of heavy machinery & drive to road conditions.
Speed reduction to 40kms / hour implemented through & past work site.
Traffic control & signs will be in place.
Barrier Works
 
 
Bus Shelter slab construction
Coffs Harbour – Stadium Drive
 
 
Solitary Islands Way, Sapphire Beach
 
 
Traffic control & signs will be in place.
Sewer Main Relocation
Bonville – Lyons Road / Bower Crescent (between Rutland Street & McFadyn Street).
Motorists, cyclists & pedestrians are to take care.
Be aware of heavy machinery & drive to road conditions.
Speed reduction to 40kms / hour implemented through & past work site.
Traffic control & signs will be in place.
Water Main Construction
Emerald Beach - Topaz Drive & Capizzi Close.
Motorists, cyclists & pedestrians are to take care.
Be aware of heavy machinery & drive to road conditions.
Speed reduction to 40kms / hour implemented through & past work site.
Traffic control & signs will be in place.
Line Marking
 
 
 
Signage
 
 
 
Motorists, cyclists & pedestrians are to take care.
Be aware of heavy machinery & drive to road conditions.
Speed reduction to 40kms / hour implemented through & past work site.
Traffic control & signs will be in place.
Cycleway Construction
Bonville – Lyons Road (between Rutland Street & McFadyn Street).
Motorists, cyclists & pedestrians are to take care.
Be aware of heavy machinery & drive to road conditions.
Speed reduction to 40kms / hour implemented through & past work site.
Traffic control & signs will be in place.
Road Reconstruction
 
Motorists, cyclists & pedestrians are to take care.
Be aware of heavy machinery & drive to road conditions.
Speed reduction to 40kms / hour implemented through & past work site.
Traffic control & signs will be in place.
Road Reconstruction
Cnr Harbour Drive & Gordon Street intersection including the shared pedestrian & traffic zone on Harbour Drive
Intersection is closed & alternative traffic diversions are in place.
Motorists, cyclists & pedestrians are to take care.